Long Island pool guide

Pool excavation and site prep on Long Island, town by town

Why Long Island digs differ so much

Long Island is glacial: a spine of moraine hills (sand, gravel and dense till) with a flat outwash plain of sand and loam running south to the bays. That gives pool builders four very different kinds of ground within a few miles:

  • Loam over sand and gravel (Haven, Riverhead, Hempstead soils). The easy case: firm walls, dry holes, good drainage.
  • Loose outwash and moraine sand (Plymouth, Carver). It digs fast but won’t hold a vertical wall, so the excavation is sloped back or shored and the backfill compacted in lifts.
  • Dense glacial till (Montauk soils). Water perches above the dense layer, so holes fill after rain and dry wells drain slowly.
  • South shore fill and wet sand near the bays and canals. Groundwater sits close to the surface, and much of it is in FEMA flood zones.

The 40-town table

Shares of each place’s land, from our grid sample of the USDA soil survey (SSURGO), FEMA’s National Flood Hazard Layer and EPA water-system maps over each Census place boundary (November 2026). “Loose sand” is soil the survey rates excessively drained. These are shares of land, not of homes, so check your own lot on the Web Soil Survey.

Town Main soil 8%+ slopes Loose sand Water table within ~3 ft FEMA flood zone Watch for
Garden City Urban land-Hempstead complex 0% 4% 0% 0% easy digging
Levittown Urban land-Hempstead complex 0% 0% 6% 0% built-over / fill
Massapequa Urban land-Sudbury complex 0% 0% 49% 21% groundwater, flood zone, built-over / fill
Merrick Urban land-Sudbury complex 0% 4% 35% 31% groundwater, flood zone
Rockville Centre Urban land-Riverhead complex (0–3%) 0% 0% 1% 1% built-over / fill
Manhasset Urban land-Montauk complex (3–8%) 31% 5% 62% 1% slopes, groundwater
Port Washington Pits, sand and gravel 13% 11% 23% 5% easy digging
Syosset Urban land-Hempstead complex 6% 2% 11% 0% easy digging
Hicksville Urban land-Hempstead complex 0% 0% 2% 0% built-over / fill
Huntington Riverhead–Haven, graded (0–8%) 36% 19% 31% 1% slopes, groundwater
Northport Riverhead–Haven, graded (0–8%) 23% 20% 1% 2% slopes
Dix Hills Haven loam (0–2%) 24% 19% 25% 0% slopes, groundwater
Commack Riverhead–Haven, graded (0–8%) 8% 13% 0% 0% easy digging
Smithtown Carver and Plymouth soils (15–35%) 24% 46% 9% 5% slopes, loose sand
Lindenhurst Riverhead–Haven, graded (0–8%) 0% 1% 3% 11% flood zone, built-over / fill
Bay Shore Riverhead–Haven, graded (0–8%) 0% 6% 2% 8% easy digging
Southampton Bridgehampton silt loam (0–2%) 0% 8% 11% 20% flood zone
Riverhead Haven loam (0–2%) 4% 27% 7% 2% easy digging
Stony Brook Riverhead–Haven, graded (0–8%) 14% 26% 6% 7% easy digging
Mount Sinai Haven loam (0–2%) 19% 16% 9% 9% easy digging
Rocky Point Riverhead sandy loam (0–3%) 9% 23% 0% 0% easy digging
Manorville Carver and Plymouth soils (3–15%) 15% 66% 4% 2% loose sand
Sayville Riverhead–Haven, graded (0–8%) 0% 13% 6% 6% easy digging
East Islip Riverhead–Haven, graded (0–8%) 0% 4% 9% 8% easy digging
West Islip Riverhead–Haven, graded (0–8%) 0% 9% 4% 7% easy digging
West Babylon Riverhead–Haven, graded (0–8%) 0% 2% 3% 8% easy digging
Deer Park Riverhead–Haven, graded (0–8%) 0% 3% 3% 0% easy digging
St. James Riverhead–Haven, graded (0–8%) 3% 3% 1% 0% easy digging
Kings Park Riverhead–Haven, graded (0–8%) 15% 32% 4% 4% easy digging
Nesconset Haven loam (0–2%) 7% 15% 0% 0% easy digging
Centerport Carver and Plymouth soils (15–35%) 55% 57% 3% 9% slopes, loose sand
Melville Haven loam (0–2%) 21% 21% 11% 0% slopes
East Northport Riverhead–Haven, graded (0–8%) 14% 3% 3% 0% easy digging
Hampton Bays Carver and Plymouth soils (3–15%) 11% 89% 6% 11% loose sand, flood zone
Westhampton Carver and Plymouth soils (0–3%) 1% 63% 2% 9% loose sand
Montauk Montauk loamy sand (15–35%) 35% 45% 59% 11% slopes, loose sand, groundwater, flood zone
East Hampton Bridgehampton silt loam (0–2%) 1% 33% 9% 19% flood zone
Southold Haven loam (0–2%) 8% 26% 14% 19% flood zone
Mattituck Haven loam (0–2%) 14% 27% 6% 9% easy digging
Shelter Island Montauk loam (3–8%) 26% 31% 52% 16% slopes, groundwater, flood zone

What each condition adds to the job

  • Slopes: a level pad, a retaining wall on the low side, steps, and drainage so runoff doesn’t wash out the deck. A semi-inground pool set into the hill can cut the wall height.
  • Loose sand: wider excavation, more backfill, compaction in lifts. Get the backfill method in writing.
  • Groundwater: dewatering during the dig and a hydrostatic relief valve, and never draining the pool yourself afterward (liner replacement).
  • Flood zones: the town’s flood rules apply on top of the pool code; keep the pump, heater and panel above the flood elevation.
  • Built-over or filled ground: a soil check before signing, and compaction under the pool and patio.

The dig, step by step

  1. Stake-out. The pool is marked from the survey (East Hampton requires a licensed surveyor to stake it before the permit).
  2. Excavation. For a 16×32 pool, about 100 cubic yards in place, roughly 10 to 12 truckloads once loosened. Access matters: on tight postwar lots, ask how the machine and the trucks get in.
  3. Walls and plumbing. Steel or polymer panels for vinyl, a shell for fiberglass, steel and shotcrete for gunite.
  4. The floor. For vinyl pools, a mason or the liner crew trowels a smooth cement-vermiculite or grout floor over the compacted base. If you hired the dig on its own, as some Facebook posters do, line up that floor work before the liner crew is booked.
  5. Backfill and grade. Compacted around the walls, then graded so the patio and yard drain away from the pool and toward the dry well your town requires (pool drainage and dry wells).

The whole sequence, with permit time, is in the pool installation timeline.

Frequently asked questions

How much dirt comes out of a 16×32 inground pool?

About 100 cubic yards in the ground (16 × 32 feet × roughly 5½ feet average depth, including over-dig), which swells to around 125 to 130 cubic yards once loosened: roughly 10 to 12 loads in a 12-yard dump truck. Some is kept for backfill and grading.

Who finishes the bottom of a vinyl liner pool?

A mason or the liner crew troweling a smooth floor, usually a cement-vermiculite or grout mix, over the compacted base before the liner goes in. It's normally part of the pool contract; if a homeowner hired the dig separately, it has to be arranged before the liner crew arrives.

What if the pool dig hits water?

The builder pumps it out (sump pumps or well points) while the floor and walls go in, and the finished pool gets a hydrostatic relief valve. On Shelter Island, the code forbids excavating below the water table at all, which can limit pool depth.

Can a skid steer dig a semi-inground pool?

For a semi-inground pool, often yes, since the dig is shallower. Grade and compaction still matter: the walls and the patio around them need a level, compacted base, and the town permit and fence rules still apply.

Sources

  1. USDA NRCS, Soil Survey Geographic Database (SSURGO) via Soil Data Access
  2. USDA NRCS Web Soil Survey (look up your own lot)
  3. FEMA Flood Map Service Center
  4. Town of Shelter Island Code Ch. 113, Swimming Pools (no dewatering)

Get a written price for your pool project

Tell us your town and the project. A licensed, independent Long Island pool company calls you back and gives you the price before any work starts. Free to ask, no obligation.

Get a free quote Call (631) 856-2404
  • No fee to you
  • Price in writing first
Call (631) 856-2404 Get a quote